RESIDENTIAL REMODELING
Bathroom Remodeling
Beautiful, functional bathrooms featuring quality finishes and coordinated renovation work.

Shower Renovations
Tile surrounds, custom glass enclosures, shower niches and fixture upgrades.
Full Bathroom Improvements
Flooring, lighting, cabinetry, surfaces and fixture updates to improve the space.
BATHROOM REMODELING / COMFORT & DURABILITY
Designed for Daily Use, Built Around Water Protection
Bathrooms are small spaces with important technical details. Waterproofing, drainage, ventilation, electrical needs, accessible layouts and carefully selected finishes all affect performance long after the remodel is complete.
01 / UNDERSTAND THE SPACE
Discuss goals, existing conditions and how the space should function.
02 / DEFINE THE SCOPE
Review drawings, materials, allowances and permitting needs.
03 / COORDINATE CONSTRUCTION
Plan access, trade sequencing, inspections and completion details.
EXPLORE THE DETAILS
What Goes Into a Great Project
01
Showers & Tub Conversions
Review available space, drain locations, enclosure and fixture options.
02
Waterproofing
Discuss appropriate wet-area assemblies beneath visible tile and finishes.
03
Vanities & Storage
Coordinate cabinetry, counters, mirrors and practical storage solutions.
04
Floor & Wall Tile
Compare durable surfaces, grout, transitions and maintenance needs.
05
Lighting & Ventilation
Plan exhaust and lighting suited to the bathroom’s size and use.
06
Accessibility Features
Consider ease of entry, support locations and layout needs where practical.
THE REMODELING PROCESS
From Idea to Final Walkthrough
01
Plan
Discuss goals, scope and budget
02
Design
Finalize selections, drawings and relevant approvals
03
Build
Coordinate demolition, rough-ins and finish trades
04
Complete
Review completed work and remaining punch items
HOMEOWNER QUESTIONS
Frequently Asked Questions
Can a bathtub become a walk-in shower?
Often yes; drain layout, dimensions and floor construction should be assessed.
Is tile waterproof?
Tile and grout alone do not replace a properly designed waterproofing assembly.
Can plumbing fixtures be moved?
Possibly; access, drain slopes and structural conditions affect feasibility.
How long will the bathroom be unavailable?
The schedule depends on plumbing, waterproofing, tile and finishing work.
Which selections should I make first?
Tile, fixtures, vanities, shower enclosures and hardware influence design and lead times.
LET’S BUILD SOMETHING BETTER
Ready to Discuss Your Project?
Tell CedarMill about the space, your priorities and your preferred timing.
Call (713) 438-2697
Let’s discuss your project
For estimates, service requests and commercial inquiries, call (713) 438-2697 or contact our team.
