RESIDENTIAL REMODELING

Bathroom Remodeling

Beautiful, functional bathrooms featuring quality finishes and coordinated renovation work.

Bathroom Remodeling

Shower Renovations

Tile surrounds, custom glass enclosures, shower niches and fixture upgrades.

Full Bathroom Improvements

Flooring, lighting, cabinetry, surfaces and fixture updates to improve the space.

BATHROOM REMODELING / COMFORT & DURABILITY

Designed for Daily Use, Built Around Water Protection

Bathrooms are small spaces with important technical details. Waterproofing, drainage, ventilation, electrical needs, accessible layouts and carefully selected finishes all affect performance long after the remodel is complete.

01 / UNDERSTAND THE SPACE

Discuss goals, existing conditions and how the space should function.

02 / DEFINE THE SCOPE

Review drawings, materials, allowances and permitting needs.

03 / COORDINATE CONSTRUCTION

Plan access, trade sequencing, inspections and completion details.

EXPLORE THE DETAILS

What Goes Into a Great Project

01

Showers & Tub Conversions

Review available space, drain locations, enclosure and fixture options.

02

Waterproofing

Discuss appropriate wet-area assemblies beneath visible tile and finishes.

03

Vanities & Storage

Coordinate cabinetry, counters, mirrors and practical storage solutions.

04

Floor & Wall Tile

Compare durable surfaces, grout, transitions and maintenance needs.

05

Lighting & Ventilation

Plan exhaust and lighting suited to the bathroom’s size and use.

06

Accessibility Features

Consider ease of entry, support locations and layout needs where practical.

THE REMODELING PROCESS

From Idea to Final Walkthrough

01

Plan

Discuss goals, scope and budget

02

Design

Finalize selections, drawings and relevant approvals

03

Build

Coordinate demolition, rough-ins and finish trades

04

Complete

Review completed work and remaining punch items

HOMEOWNER QUESTIONS

Frequently Asked Questions

Can a bathtub become a walk-in shower?

Often yes; drain layout, dimensions and floor construction should be assessed.

Is tile waterproof?

Tile and grout alone do not replace a properly designed waterproofing assembly.

Can plumbing fixtures be moved?

Possibly; access, drain slopes and structural conditions affect feasibility.

How long will the bathroom be unavailable?

The schedule depends on plumbing, waterproofing, tile and finishing work.

Which selections should I make first?

Tile, fixtures, vanities, shower enclosures and hardware influence design and lead times.

LET’S BUILD SOMETHING BETTER

Ready to Discuss Your Project?

Tell CedarMill about the space, your priorities and your preferred timing.

Call (713) 438-2697

Let’s discuss your project

For estimates, service requests and commercial inquiries, call (713) 438-2697 or contact our team.